Following the Latham Report, the Cabinet Office commissioned Sir Peter Levene to review government procurement of construction and investigate how government could become a best practice client.
The Levene Efficiency Scrutiny into Construction Procurement by Government was published in 1995.
The report accepted that government was in part to blame for the poor performance of the construction industry, setting unrealistic timeframes and budgets, not properly understanding competition or risk and failing to create single points of contact.
It made a number of recommendations to improve the management of projects:
- Better communication with the industry to reduce disputes.
- Adoption of a more commercial approach.
- Negotiation based on value for money.
- Increased training for civil servants.
- The creation of single points of contact.
The Treasury assumed responsibility for coordinating construction procurement policy across government, and this role was later given to the Office of Government Commerce (OGC). NB OGC has now been absorbed into the Efficiency and Reform Group (ERG) within the Cabinet Office.
In March 1997, following the publication of the Levene Report, the Government Construction Clients’ Panel (GCCP) was established with membership from across government. This resulted in the creation of the Achieving Excellence initiative in 1999 to implement the recommendations contained in the report.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Construction industry reports since 1944.
- Egan Report.
- Latham Report.
- OGC.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
Comments
To start a discussion about this article, click 'Add a comment' above and add your thoughts to this discussion page.